A CLT Residence in Vasiliki, Lefkada


24 Σεπ. 2026

CLT in Lefkada: a new generation of timber construction

Among the olive groves of Vasiliki, Lefkada, a 100 m² CLT house is being built with a load-bearing structure of Cross-Laminated Timber (CLT), bringing modern Mass Timber technology to an island with a long and distinctive relationship with wood.

CLT Greece’s first project in Lefkada is an important milestone for us, and one more step in the development of modern timber construction in Greece.

Aerial view of the completed CLT shell of the residence in Vasiliki, Lefkada, among olive trees

The CLT structure of the residence in Vasiliki, shortly after assembly.

The project at a glance

Location
Vasiliki, Lefkada, Greece
Project type
Private residence
Floor area
100 m²
Structural system
Cross-Laminated Timber (CLT)
CLT panels
350 m², 3-layer, 80 & 100 mm
Roof
Load-bearing Glulam GL24h timber structure
CLT assembly
2 days
Roof construction
4 days
Year
2026

Project credits

  • CLT GreeceCLT technical consulting & project development, CLT structural design, technical coordination, supply & logistics, CLT installation and assembly
  • XLAM DolomitiCLT production, shop drawings & engineering, CNC machining, specialised installation support
  • Karabelas Bros S.A.Glulam GL24h structural timber, timber roof systems, thermal insulation, external insulation & envelope materials
  • RothoblaasComplete connection systems and technical solutions for CLT & Glulam construction
  • Local crew, LefkadaTimber roof construction & installation
3D structural model of the CLT house in Vasiliki, Lefkada, shell and roof view

From design to construction

Building with CLT begins long before the construction site.

Structural engineering, shop drawings and digital design turn the building into a prefabricated structural system, in which every element is produced and machined with precision before it is delivered to site.

The CLT panels for the residence were manufactured at the XLAM Dolomiti facilities in Italy, with digital CNC machining and each element prepared according to the project’s construction model.

They were then shipped to Vasiliki, ready for assembly.

CLT shell in two days

One of the most striking features of the project was the speed of construction. The load-bearing CLT structure was assembled in just two days, demonstrating in practice the advantages of prefabrication, precision and proper planning.

Drone flight around the completed CLT structure in Vasiliki, Lefkada.

Inside the CLT shell during assembly.

The Glulam timber roof of the CLT house in Vasiliki, Lefkada, drone plan and perspective views

The completed timber roof, in plan and perspective.

Building the roof

Next came the Glulam GL24h timber roof, which was completed in four days.

Behind these few days of work on site lies a complete process of structural engineering, technical design, precise factory production, transport logistics and coordinated assembly.

A collaborative project

In Lefkada, the collaboration between CLT Greece, our partner engineer on the island, the local crews and the project’s individual partners was decisive to its successful delivery.

Site conditions were particularly demanding. Very difficult access, high August temperatures and heavy summer traffic on the island created significant challenges for transport, organisation and execution of the works.

Despite these difficulties, sound coordination, local knowledge, experience and the cooperation of everyone involved allowed the project to move forward with precision, speed and efficiency.

Materials and equipment delivered to the CLT house construction site in Vasiliki, Lefkada
The team assembling the CLT panels in Vasiliki, Lefkada (1) The team assembling the CLT panels in Vasiliki, Lefkada (2) The team assembling the CLT panels in Vasiliki, Lefkada (3) The team assembling the CLT panels in Vasiliki, Lefkada (4) The team assembling the CLT panels in Vasiliki, Lefkada (5) The team assembling the CLT panels in Vasiliki, Lefkada (6) The team assembling the CLT panels in Vasiliki, Lefkada (7) The team assembling the CLT panels in Vasiliki, Lefkada (8) The team assembling the CLT panels in Vasiliki, Lefkada (9) The team assembling the CLT panels in Vasiliki, Lefkada (10) The team assembling the CLT panels in Vasiliki, Lefkada (11) The team assembling the CLT panels in Vasiliki, Lefkada (12) The team assembling the CLT panels in Vasiliki, Lefkada (13)

The next stage: the building envelope

With the CLT structure and the roof complete, work continues on the building envelope — the external thermal insulation and the materials that close and protect the timber structure.

The CLT house in Vasiliki, Lefkada with the roof completed and external insulation on the facades
Insulation boards being fixed to the facades of the CLT house in Lefkada
Side view of the CLT house in Vasiliki with its Glulam timber roof and envelope insulation
Centuries-old olive tree in Vasiliki, Lefkada, next to the CLT house construction site

Lefkada meets wood again

A modern CLT project in Lefkada carries a special significance.

In a place of strong seismic activity, timber has historically held an important place in the local building tradition. Today it returns in a new, advanced form.

Cross-Laminated Timber and Mass Timber bring wood into contemporary engineering and architecture, through structural design, certified industrial production, digital machining and high construction precision.

This connection between a familiar material and modern technology was already evident during construction.

Local residents, engineers, professionals and private individuals visited the site to see CLT up close, get to know the system and understand how it is applied to a real home.

For many, this first contact with the build sparked immediate interest in how CLT could be used in their own projects — from design and construction possibilities to the cost of a CLT house in Lefkada.

Frequently asked questions about CLT houses

CLT (Cross-Laminated Timber) is structural timber made of stacked layers of solid wood glued at alternating angles, forming high-strength load-bearing panels. Unlike conventional masonry or reinforced concrete, a CLT house is manufactured almost entirely under factory conditions with CNC machining, then assembled on site within a few days.

The cost of a CLT house depends on location, floor area, finishing level and shell specifications. See how CLT construction cost is determined, or request a free project estimate for your own house.

Thanks to prefabrication, the load-bearing structure of a CLT house is usually assembled within just a few days. On this project in Vasiliki, Lefkada, 350 m² of CLT panels were assembled in 2 days and the Glulam timber roof was completed 4 days later, not counting finishing works.

Yes. Mass timber CLT combines low weight with high stiffness, giving it very good seismic performance. The CLT used by CLT Greece is PEFC-certified and carries an Environmental Product Declaration (EPD), in line with European building standards.

A properly engineered and maintained CLT house has a lifespan comparable to, or longer than, a conventional building, thanks to the quality of the solid timber, certified industrial production, and correct moisture protection of the shell at the design stage.

A new reference point for CLT in Lefkada

For us, the residence in Vasiliki is more than just another project. It is a real example of modern timber construction in Lefkada, where architects, engineers and private clients can now see CLT and Mass Timber applied in practice.

For CLT Greece, it is another important step towards our goal: bringing the know-how and potential of modern timber construction to more projects and more regions of Greece and Cyprus.

CLT Greece — Build with Consciousness

Completed shell of the CLT house in Vasiliki, Lefkada